Harvest One: Giving it a Test Run
Posted on | November 8, 2009 | 2 Comments
By Scott Boylston
We’ve started small to work out the bugs, but the results were inspiring. Thank you to the many, many volunteers who helped with the dismantling process, and congratulations to the Pioneer Harvesters. For this particular event, only non-structural elements were accessible for reclamation; shelves, cabinets, interior doors, loose lumber, etc. We are in the process of planning for larger scale reclamation days, soon to come.

Announcement for the first harvest
Our very first harvester…

came back for a second helping!

HER HARVEST:
I kitchen cabinet
6 shelves
13 closet doors (45 lbs each)
12 8 foot 2 x 4s
3 13 foot 2 x 4s
2 13 foot 1 x 4s

THEIR HARVEST:
80 5 lb bricks
2 hollow doors (45 lbs each)
2 closet doors
1 Savannah grey brick
1 terra cota pipe
1 metal piping

HER HARVEST:
61 metal address numbers (total of 3 lbs)

THEIR HARVEST:
2 doors (45lbs each)

HIS HARVEST:
30 bricks (5 lbs each)
3 concrete blocks (10 lbs each)

THEIR HARVEST:
1 window
1 closet door (45 lbs)
I mirror cabinet

HER HARVEST:
Hey, Kathy, where’s your form!
Comments
2 Responses to “Harvest One: Giving it a Test Run”
Leave a Reply
November 9th, 2009 @ 8:15 AM
It was a great day with about 70 students and faculty from SCAD and Savannah Tech.
Sorry about the form. It was the end of a very good day.
November 9th, 2009 @ 8:16 AM
List of goods:
7 shelves
3 doors
3 medicine cabinets